Lost circulation delays drilling time and causes a significant cost and increased safety risk for operators with the loss of whole mud. When the wellbore is stabilized, the need for lost circulation remediation decreases, and drilling delays are no longer encountered. Newpark’s proprietary line of wellbore stabilization products minimize these risks in all types of drilling environments.